news 2026/3/31 4:38:57

Sprint Blog 2 (Dec 14-Dec 15) from“Pulse news stream”

作者头像

张小明

前端开发工程师

1.2k 24
文章封面图
Sprint Blog 2 (Dec 14-Dec 15) from“Pulse news stream”

目录

I. Overview of the second Day of Sprint Progress

1. Sprint Phase Background

2. Task Completion Status in Two Days

3. Unfinished Tasks and Reasons (To Be Prioritized Next Sprint)

II. Core Deliverables

III.Problems Encountered and Solutions

Code Conflict Issue

IV.Task Plan for the Next Day


Course Belonging ToEE301
Source of Assignment RequirementsFifth Assignment——Alpha Sprint-CSDN社区
Goal of This AssignmentCourse Objective 3
Other References“Pulse news stream” Design Assignment-CSDN博客

I. Overview of the second Day of Sprint Progress

1. Sprint Phase Background

Building on Day 1’s progress (front-end/back-end basic communication, homepage news list docking, initial FZU Column connection), this two-day sprint focused onclosing Day 1’s core pending tasks, repairing known bugs, and optimizing the stability of existing functions—ensuring basic modules operate smoothly to prepare for the news bookmarking function (the key task of the next phase).

2. Task Completion Status in Two Days

  • Login Module Full-Process Integration (Pending from Day 1)The front-end and back-end teams unified the password encryption algorithm, fixed the back-end token generation vulnerability, and completed end-to-end debugging of the login function. Users can now seamlessly complete the full workflow (enter credentials → back-end verification → token storage → page redirection); auxiliary features like "remember password" and "incorrect password prompts" passed all test cases, and login status remains stable after page refreshes.
  • Closed-Loop Repair of Day 1’s Bugs
    • The front-end team optimized the anti-shake logic for the homepage news list’s pull-to-refresh function (setting a 500ms request interval threshold), completely eliminating occasional duplicate data loading.
    • The back-end team corrected the route configuration of the FZU Column detail page and adjusted front-end/back-end parameter transfer rules, fully resolving the 404 error.All fixed bugs were verified by the testing team and marked "Closed" in the bug management tool.
  • Basic Optimization of Existing FunctionsThe team optimized the response speed of the homepage news list interface: by compressing the returned data format, the average loading time was reduced from 1.1 seconds to 0.7 seconds, improving the page opening experience.

3. Unfinished Tasks and Reasons (To Be Prioritized Next Sprint)

  • Unfinished Task: News bookmarking function development (users cannot save favorite news to the personal center yet).
    • Reason Analysis: Extra time spent on debugging the login module’s token stability delayed the start of this task (the function requires a new database table and front-end interactive components).
    • Compensation Plan: The back-end will design the news-bookmark relationship table on the first morning of the next sprint; the front-end and back-end will complete parallel development and joint debugging in the afternoon, ensuring the function is launched before the third sprint blog is published.

II. Core Deliverables

Code debugging and modification:

Linking and Information Entry for Fuzhou University Column:

III.Problems Encountered and Solutions

Code Conflict Issue

  • Problem Description: When synchronizing the login module’s optimized code to the team repository, a conflict occurred (two members edited the same authentication logic file), causing partial code loss.
  • Solution: Rolled back to the latest stable version, merged the modified content manually, and established code submission rules: (1) Pull the latest repository code before editing; (2) Notify the team when modifying core function files.
  • Follow-up: A 10-minute team sync will be held at the start of the next sprint to review these rules.

IV.Task Plan for the Next Day

  1. Prioritize Pending Task: Complete the news bookmarking function
    • Back-end: Design and create the news-bookmark relationship table; develop "add bookmark" and "query bookmark list" interfaces.
    • Front-end: Add a bookmark button to news cards; develop the bookmark list page in the personal center.
  2. Stabilize Existing Functions: Conduct regression testing on the login module and FZU Column pages to ensure no new bugs are introduced.
  3. Small Optimization: Adjust the FZU Column’s text line spacing (based on user experience feedback) to improve readability.
版权声明: 本文来自互联网用户投稿,该文观点仅代表作者本人,不代表本站立场。本站仅提供信息存储空间服务,不拥有所有权,不承担相关法律责任。如若内容造成侵权/违法违规/事实不符,请联系邮箱:809451989@qq.com进行投诉反馈,一经查实,立即删除!
网站建设 2026/3/31 19:52:05

【提升AI系统协同效率】:Docker-LangGraph多Agent通信优化的7大策略

第一章:Docker-LangGraph多Agent通信的核心挑战在构建基于Docker与LangGraph的多Agent系统时,通信机制的设计面临多重技术挑战。不同Agent可能运行于隔离的容器环境中,如何实现高效、可靠的消息传递成为系统稳定性的关键。网络隔离带来的通信…

作者头像 李华
网站建设 2026/3/31 1:17:58

【Dify导出性能优化】:从响应延迟到秒级输出的3次架构迭代

第一章:Dify导出性能优化的背景与挑战在现代低代码平台中,Dify 作为集成了 AI 工作流编排与应用生成的核心系统,承担着大量用户配置、流程定义和模型部署数据的导出需求。随着业务规模扩大,导出操作面临响应延迟、内存溢出及数据一…

作者头像 李华
网站建设 2026/3/19 23:51:06

【Dify工作流错误重试机制深度解析】:掌握高可用系统设计的核心秘诀

第一章:Dify工作流错误重试机制的核心价值在构建复杂AI驱动的应用时,网络波动、服务超时或临时性资源争用等问题难以避免。Dify工作流的错误重试机制正是为应对这类非永久性故障而设计的关键能力,它确保任务在遭遇瞬时异常时能够自动恢复&…

作者头像 李华
网站建设 2026/3/13 0:11:49

为什么顶尖团队都在用Docker Scout做漏洞管理?真相终于曝光

第一章:为什么顶尖团队都在用Docker Scout做漏洞管理?真相终于曝光在现代云原生开发中,容器镜像安全已成为软件交付链中的关键环节。越来越多的顶尖技术团队选择 Docker Scout 来实现精细化的漏洞管理,其核心优势在于深度集成于开…

作者头像 李华
网站建设 2026/3/16 4:15:36

团购网站系统源码 Java+SpringBoot+Vue 万字文档

一、关键词 团购网站系统,团购平台系统,团购管理系统二、作品包含 源码数据库万字设计文档PPT全套环境和工具资源本地部署教程三、项目技术 前端技术:Html、Css、Js、Vue2.0、Element-ui 、layui 后端技术:Java、SpringBoot2.0、M…

作者头像 李华
网站建设 2026/3/26 6:05:28

饮料商城系统源码 Java+SpringBoot+Vue

一、关键词 饮料线上商城系统,饮品零售管理系统,饮料销售商城平台 二、作品包含 源码数据库全套环境和工具资源本地部署教程 三、项目技术 前端技术:Html、Css、Js、Vue2.0、Element-ui 后端技术:Java、SpringBoot2.0、MyBatis…

作者头像 李华